The foundation of a lasting finish
Roof preparation
without shortcuts.
The quality and life expectancy of a roof coating begins with cleaning and preparation. We remove contaminants, complete necessary repairs and inspect the surface carefully before coating starts.


Why preparation matters
A coating is only as good as the surface beneath it.
Dirt, moss, loose material and failed pointing can interfere with adhesion and reduce the performance of a roof coating. Thorough cleaning helps expose defects so they can be addressed before the finish is applied.
Our preparation process also considers gutters, surrounding walls and paths, helping leave the property tidy and ready for the next stage.
We do it once. We do it right.
Our 12-step preparation process.
01
Manage wastewater
Dam and pump wastewater onto suitable grassed areas where practical.
02
Replace broken tiles
Identify and replace broken or badly damaged roof tiles.
03
Machine clean
Thoroughly clean the roof surface to remove dirt, moss and contaminants.
04
Clean tile ends
Pressure clean tile edges and difficult areas for consistent preparation.
05
Clean the gutters
Remove loosened debris and clean out roof gutters after washing.
06
Wash surrounding areas
Rinse external walls, paths and affected areas after roof cleaning.
07
Re-bed ridge caps
Repair unstable ridge capping and renew bedding where required.
08
Apply flexible pointing
Apply flexible pointing to ridge capping for movement and protection.
09
Brush finish pointing
Finish the flexible pointing carefully for a smooth, consistent result.
10
Seal problem areas
Seal valleys and penetrations such as antenna mounting points as required.
11
Complete approved extras
Install approved roof ventilation or related items included in the work.
12
Rinse and inspect
Complete a final rinse and inspection before any coating begins.
Thorough cleaning
Contaminants and loose material are removed before coating.
Necessary repairs
Broken tiles, bedding and pointing are addressed as required.
Final inspection
The prepared surface is rinsed and checked before painting begins.
